Availability: | |
---|---|
Quantity: | |
1. Composite structure
2. Size and capacity can be designed according to users
3. Mainly used for the storage of long, circular or irregular shape goods
4. High quality steel, epoxy powder coating in the surface and color optional
Product Name | Galvanized Q235 Steel Industrial Cold Rolled Cantilever Rack For Warehouse Storage |
Material | steel Q235 |
Color | RAL5005; RAL2004 |
Standard | ISO9001, SGS |
Length of Arm | <=1500mm |
Depth of column | 1000mm,1500mm,2000mm |
Capacity of Arm | <=1000kgs |
Height of column | <=8000mm |
WE DESIGN ACCORDING TO GOODS DIMENSION AND WEIGHTS.
Packing Details : Normal packing with films and cartons
Delivery Details : 15 days after getting down payment.
Customer has much interestes in our racking system and radio shuttle.
Customer discussed with us about medium duty racking design and packing.
We can advice you our best products according to your requirements,
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
1. Composite structure
2. Size and capacity can be designed according to users
3. Mainly used for the storage of long, circular or irregular shape goods
4. High quality steel, epoxy powder coating in the surface and color optional
Product Name | Galvanized Q235 Steel Industrial Cold Rolled Cantilever Rack For Warehouse Storage |
Material | steel Q235 |
Color | RAL5005; RAL2004 |
Standard | ISO9001, SGS |
Length of Arm | <=1500mm |
Depth of column | 1000mm,1500mm,2000mm |
Capacity of Arm | <=1000kgs |
Height of column | <=8000mm |
WE DESIGN ACCORDING TO GOODS DIMENSION AND WEIGHTS.
Packing Details : Normal packing with films and cartons
Delivery Details : 15 days after getting down payment.
Customer has much interestes in our racking system and radio shuttle.
Customer discussed with us about medium duty racking design and packing.
We can advice you our best products according to your requirements,
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Do Not Hesitate to Contact Us if You Have Any Questions.
+86 25 86137721 / 0086-13611596095
Add: 9th floor, Jinlunxinduhui, No.1118, Shuanglongdadao Road, Nanjing, China
Copyright 2019 Jiangsu Union Logistics System Engineering Co.,Ltd