Availability: | |
---|---|
Quantity: | |
This type of racking is suitable for keeping materials of big, long size, such as pipes and shaped steel, etc. Materials are put on the cantilever. This is suitable for small warehouse, and is popular with machinery processing and building-material supermarket.
Product Name | Heavy Duty Cantilever Storage Racking for Car Industry |
Material | Q235 |
Color | RAL5005 OR CUSTOMIZED |
Standard | 400~600KG PER ARM |
Material Specification | C STEEL |
Height | 4000~8000mm |
Type | SINGLE SIDE OR DOUBLE SIDE |
Used | building industry machinery |
Please kindly provide the below to us for quotation:
1. Dimension of your warehouse (CAD drawing draft)
2. Width, height, length of the shelf
3. How many layers you need
4. Loading capacity of each layer
5. RAL color you need
Our Workshop
Our Warehouse
Our Team
Packing Details : Normal export packing
Delivery Details : 15-30 days after receiving deposit
NORMAL WAREHOUSE RACKING
2~3 FLOOR
200~500KG/LEVEL
FORKLIFT CAN ENTER INSIDE THE RACK
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: 30% T/T in advance , balance after receiving copy of B/L within 2 days.
If you have another question, pls feel free to contact us as below:
This type of racking is suitable for keeping materials of big, long size, such as pipes and shaped steel, etc. Materials are put on the cantilever. This is suitable for small warehouse, and is popular with machinery processing and building-material supermarket.
Product Name | Heavy Duty Cantilever Storage Racking for Car Industry |
Material | Q235 |
Color | RAL5005 OR CUSTOMIZED |
Standard | 400~600KG PER ARM |
Material Specification | C STEEL |
Height | 4000~8000mm |
Type | SINGLE SIDE OR DOUBLE SIDE |
Used | building industry machinery |
Please kindly provide the below to us for quotation:
1. Dimension of your warehouse (CAD drawing draft)
2. Width, height, length of the shelf
3. How many layers you need
4. Loading capacity of each layer
5. RAL color you need
Our Workshop
Our Warehouse
Our Team
Packing Details : Normal export packing
Delivery Details : 15-30 days after receiving deposit
NORMAL WAREHOUSE RACKING
2~3 FLOOR
200~500KG/LEVEL
FORKLIFT CAN ENTER INSIDE THE RACK
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: 30% T/T in advance , balance after receiving copy of B/L within 2 days.
If you have another question, pls feel free to contact us as below:
Do Not Hesitate to Contact Us if You Have Any Questions.
+86 25 86137721 / 0086-13611596095
Add: 9th floor, Jinlunxinduhui, No.1118, Shuanglongdadao Road, Nanjing, China
Copyright 2019 Jiangsu Union Logistics System Engineering Co.,Ltd