   +86 25 86137721           Inquiry us  
High Speed Heavy Duty FIFO Automated Radio Shuttle Rack
You are here: Home » Products » Automatic Storage System » Radio Shuttle Racking System » High Speed Heavy Duty FIFO Automated Radio Shuttle Rack

CATEGORIES

loading

Share to:
sharethis sharing button

High Speed Heavy Duty FIFO Automated Radio Shuttle Rack

Availability:
Quantity:
Product Description

High Speed Heavy Duty FIFO Automated Radio Shuttle Rack

High Speed Heavy Duty FIFO Automated Radio Shuttle Rack is a racking system with high density storage including racking and electrically powered pallet runners, which works with forklifts. This high efficient storage solution provides a new option to maximum use of warehouse volume.
 

Radio shuttle car specification.

Lift Distance: 22mm
Total Weight of Loading: Max.2000kg
Running without Load: 1.1m/s,with max load:0.5m/s
Single Lift time: 1.1s / 1.3s / 1.5s
Total Weight of Equipment: 222-240kg
Battery Packs Capacity: BYD 2 set x 24V 30AH
Running Noise: < 70DB
Remote Control Type: Radio-transmitter

Part Name  
Brand  
Country  
Driver motor for running  
Lenze GKR03-2P HAR 063C21 370W  
Germany  
Driver motor for lift  
Lenze GFL04-2F HCR 063C21 370W  
Germany  
Battery packs capacity  
AMD 24V 60AH  
China  
Programmable Logic Controller  
Siemens PLC  
Germany  
SickSensor  
Sensor  
Germany  
 
Detailed Images

High Speed Heavy Duty FIFO Automated Radio Shuttle Rack

The radio racking system inckuding the rack,the shuttle cart,the guide rail.
 
 
 
 
 
Our Service
 

CAD drawing and 3D drawing as your requirements

Kindly provide information for quick and exact quotation,
1. Drawing (If available)
2. Size (Width, Depth, Height)
3. Entry type
4. Loading capacity
5. Quantity
6. (RAL) color you want

Related Products
 
 
 
 
Office & Producing

Factory History

Start 1995,
The professional manufacture of all types of racking system-Jiangsu Union was founded since 1995.

Our Team

The company team consists of talents from various fields,such as the PM, drawing designer,technical engineer,international sales,QC and so on.

Exhibition

Every year we need to take part in the professional exhibition more than 2 times.Suce as the Cemat and any related industrial exhibition.

 
 
Certifications
 
 
 
 
Packing & Delivery

Step 1

Packed the beams and uprights for the radio shuttle rack together with wrapping film.

Step 2

Packed the guide rail for the radio shuttle rack together with wrapping film.

Step 3

Packed the single shuttle car in the non-fumigation wooden box.

Previous: 
Next: 

Do Not Hesitate to Contact Us if You Have Any Questions.

Contact Union Logistics

   +86 25 86137721 / 0086-13611596095

  dorothy@unionrack.com

  Add: 9th floor, Jinlunxinduhui, No.1118, Shuanglongdadao Road, Nanjing, China

Inquiry us

Copyright 2019 Jiangsu Union Logistics System Engineering Co.,Ltd